Roofers in Bramber

Bramber sits where the Adur cuts through the Downs, beneath its castle mound. Its flint walls, timber-framed buildings and 1950s streets east of the bridge each ask for a different kind of roof care.

Three kinds of Bramber building, and what their roofs need

  • A flint gable beside a tiled roof

    Flint cottages and unpainted walls

    The council's conservation area leaflet lists unpainted field flint buildings and walls among Bramber's distinctive features. A flint gable leaves little room for error where a tiled slope meets it, so lead flashings and their mortar joints are our first check.

  • An old timber-framed roof

    Timber frames beside the river

    St Mary's is a timber-framed medieval building that may once have housed the bridge warden, and old frames move with age.

    Read more about Timber frames beside the river

    A new covering has to follow the roof's shape, so we check rafters and battens (the slim laths tiles hang from) first.

  • A 1950s tiled house roof

    Streets built east of the bridge

    The leaflet says the village was extended east of Bramber Bridge in the 1950s. Roofs from that decade are now well into later life, and any flat-roofed porch or garage added since needs its own look, apart from the main slope.

Street map of Bramber, north-east of central Worthing, with a pin on the town.

Where Bramber sits on the planning map

Planning authority
Horsham District Council
Councils
Horsham District Council and West Sussex County Council
Conservation area
Bramber Conservation Area, covered by a Horsham District Council character leaflet (December 1997)
Parish church
Church of England; St Nicholas is built of flint rubble and freestone
From central Worthing
7.2 road miles, north-east, about 16 minutes by car

Bramber roofs

Flint, timber and the Adur crossing

Three roofing questions shaped by the way Bramber was built, from the castle borough through to the 1950s streets.

Chapter one

Lead flashings against Bramber's flint walls

Where a tiled slope meets flint, a strip of lead does the sealing, and the stone around it decides how long that seal lasts.

The Horsham District Council leaflet for Bramber lists unpainted field flint buildings and walls among the village's distinctive features. Flint itself is hard and rarely fails. The weak point is the join. Where a tiled slope meets a flint gable or a flint chimney, a strip of lead called a flashing is dressed over the junction and tucked into a raked-out mortar joint. Water that gets behind it tracks down the masonry and surfaces as a plaster stain, usually a long way below the fault itself.

At a glance

  • Unpainted field flint is a village feature
  • Flashing joints in flint are deep and uneven
  • Code 4 lead is the usual flashing choice
Lead-lined valley where two clay-tiled roof slopes meet
Lead-lined valley where two clay-tiled roof slopes meet

1.1 Reading a flint junction

Field flints are round and uneven, so the joints around them are deeper and less regular than the neat lines in brick. At each junction we check three things: whether the lead still sits tight in its joint, whether the pointing around it has crumbled, and whether someone has run a bead of sealant along the top to hide a gap. Sealant only covers the problem for a season. It splits as the lead warms and cools, and water follows the split. A repair that lasts means lifting the old lead, raking the joint clean and fixing new lead back into it with wedges and fresh mortar, then photographing the finished line so you can see what was done.

Lead-lined valley where two clay-tiled roof slopes meet
Lead-lined valley where two clay-tiled roof slopes meet

1.2 Which lead, and where

Lead is sold in numbered codes, which are simply thicknesses. For ordinary flashing work code 4 has become the usual pick, and thin code 3 is advised for soakers alone. A soaker is a folded piece of lead slipped beneath each course of tiles at a wall junction, so the tiles shed water onto it. Our lead roofing page explains codes, dressing and lifespan in more depth.

On a cottage the chimney stack is often the tallest part of the roof, standing in the open with nothing to shelter it. We look at the pointing on the brick or flint, at the flaunching, the sloped mortar collar that holds the pot in place and carries rain away from it, and at the lead tray where the stack leaves the roof. A stack with failing pointing and a loose pot can drop debris onto the slope below, so we deal with it before the flashing. Our chimney repairs page covers what can be done, from repointing up to rebuilding the stack.

Lead codes for a flashing or soaker

Code 3
1.32 mm, soakers and light duty
Code 4
1.80 mm, general flashing work
Code 5
2.24 mm, vertical and pitched work
Code 6
2.65 mm, larger roofs

Source: Leadworx, Lead Sheet Codes Explained; Royston Lead, fetched October 2026

Chapter two

Old timbers and the church of St Nicholas

From the bridge warden's timber-framed building to a flint church begun in the 1070s, Bramber's oldest roofs are repaired by asking first.

Old clay tile roof over a flint wall in a downland village
Old clay tile roof over a flint wall in a downland village

According to the Victoria County History, St Mary's in Bramber is a timber-framed medieval building that may have been the house of the bridge warden. Not every Bramber roof is that old, but anything framed in oak shares the same trait: the timbers have shifted over the centuries, so the roof planes are seldom flat or straight. A modern covering does not forgive that. Battens must be set to follow the actual surface, and tiles are chosen to sit on a roof that is slightly wavy.

At a glance

  • St Mary's is a medieval timber-framed building
  • St Nicholas is flint rubble and freestone
  • Check listing before changing any covering

2.1 Starting with the frame

On an old building we begin in the loft, not on the ladder. We look at the rafters and the wall plates, the horizontal timbers on top of the walls that the rafters rest on, for damp, insect damage and old repairs. Dark marks around the chimney or along the lowest rafters show the path the water has taken. Where timbers have been repaired before, we note which joints are original and which are later infill, because the roof should be repaired to suit the frame beneath it. Only then do we go outside, lift a few tiles and see what lies beneath: sound battens, a perished underlay or none at all. Underlay is the layer beneath the battens that catches water blown past the tiles, and on a frame this old it may never have been fitted. Each stage is photographed for the written quote, so the reason for any work is plain.

2.2 The church, listed houses and consent

The parish church of St Nicholas is built of flint rubble and freestone and keeps a tower and nave from a building begun around 1073. The Church of England looks after it, and for as long as services continue there, work on it follows the Church's own faculty process rather than the council's. Houses are different. If yours is listed, repairs that are not carried out in matching materials can need listed building consent, and replacing a covering is the usual trigger. Ask Horsham District Council before work starts, and send them photographs showing the roof in its current state.

Inside the Bramber Conservation Area, a like-for-like repair rarely counts as development at all. Changing the covering, or adding a roof window, is where the rules begin to matter, and our roof planning permission guide explains them. Bats and nesting birds are protected by law, so an old roof with deep eaves is checked for both before any stripping starts.

How we survey an old timber-framed roof

  1. Loft first We check rafters, wall plates and chimney breast timbers for damp before any tile is touched.
  2. Lift and look A few tiles come up so you can see the battens and underlay in the photographs.
  3. Trace the water Stains inside are followed back along the timbers to the flashing, valley or gap that let it in.
  4. Match the roof Tiles, stone or slate are chosen to sit beside the covering already there.

Chapter three

Repairing or re-roofing a 1950s Bramber house

Houses added east of the bridge in the 1950s have reached the age where one more patch may no longer be the sensible choice.

The conservation area leaflet records that Bramber was extended east of the bridge during the 1950s. A roof from that decade is now more than sixty years old. Some are still sound; others are at the point where every wet month brings a new slipped tile. The survey tells us which. On the survey we tally slipped and cracked tiles, probe the nails and battens, test the underlay and follow any damp into the timbers. Trouble confined to a valley or a single slope suggests a repair. Trouble on every slope suggests a re-roof, and we name the one we recommend and give the reason.

At a glance

  • One failing slope points to repair, not re-roof
  • Small re-roofs often need no building control application
  • Re-roofing carries the standard rate of VAT
Row of concrete sectional garages with weathered grey corrugated roofs
Row of concrete sectional garages with weathered grey corrugated roofs

3.1 How long a covering lasts

Marley reports that the Building Research Establishment set a minimum life expectancy of 60 years for clay tiles, and concrete tiles are often put at 30 to 60 years. Treat those as typical bands, never promises: how exposed the roof is, who laid it and how it was looked after all shift the figure. A roof close to the end of that band can still be patched, though each patch spends money a re-roof would have used.

Row of concrete sectional garages with weathered grey corrugated roofs
Row of concrete sectional garages with weathered grey corrugated roofs

3.2 Building Regulations and what moves the price

The Planning Portal says building control is normally not required for repairs or re-covering that touch less than 25 per cent of the building envelope and under 50 per cent of the roof. Go past either limit, or fit a covering whose weight rises by 15 per cent or more, and approval is needed, with a thermal upgrade under Part L possible too. When the work is notifiable, we file the notification. The total moves with scaffold, access, the covering chosen and how sound the timbers underneath prove to be, and a flat-roofed porch or garage is surveyed separately from the main slope. A re-roof is standard-rated for VAT, so make sure every quote you weigh up states whether VAT and scaffolding are included. Our roof replacement page covers a full re-roof from strip to finish, including how the old tiles come down and how the new battens go on.

Typical UK costs for a house roof

  • Moderate roof repair£500 to £1,000
  • Storm damage fix£500 to £1,500
  • Gable re-roof, semi£5,000 to £8,000
  • Flat roof, semi£2,500 to £6,000

These are national guides. Your own figure comes from the survey as one written total price. Whatever you compare it with, find out if VAT and scaffolding sit inside it. Source: MyBuilder roof repair and new roof price guides, updated 21/08/2026.

Bramber roof questions, from flint gables to the 1950s streets

Can a flint gable in Bramber keep its old flashing, or does the lead need replacing?

It depends on the lead and the joint. If the lead is whole, sits tight in the mortar and has no sealant smeared over it, it can often stay. If it has split, lifted or been hidden under sealant, we replace it, rake the joint clean and fix new lead in with wedges and fresh mortar. We photograph the junction both before and after, which shows you which case applies.

Can I re-cover my roof in the Bramber Conservation Area?

A like-for-like repair rarely counts as development, even in a conservation area. Ask first if you are switching material, adding a roof window or living in a listed house. Horsham District Council is the planning authority for Bramber, and it can tell you whether any direction removes permitted development rights on your street. We match the existing tile and photograph the roof before we start.

Is a chimney stack on a Bramber cottage better repointed or rebuilt?

Repointing is enough when the bricks or flints are sound and only the mortar has failed. A rebuild is for stacks that lean, have cracked through or have bricks crumbling under the pointing. MyBuilder puts chimney repointing at a typical UK range of £500 to £2,000. We tell you which your stack needs after looking at it from a ladder, with photographs, and the written quote is a single total price.

Do the 1950s houses east of Bramber Bridge need building control for a new roof?

Often not for a repair, though size decides. The Planning Portal sets the limits at 25 per cent of the building envelope and 50 per cent of the roof, and a patch stays well inside both. A full re-roof usually crosses them, and a markedly heavier covering also brings approval. We set out which route applies and file the notification when the work needs one.

Tell us about your roof

Describe what is happening and we will call you back to arrange a visit.

  • Photographs of what we find
  • A written quote with one total price
  • Or call 01903 299063

10-year workmanship guarantee, in writing.

Call Get a quote