Chapter one
Ageing tiled roofs on the new-town estates
Crawley went up neighbourhood by neighbourhood from 1947, so whole streets of roofs now reach the same age together.
Crawley New Town was designated under the 1947 Crawley New Town (Designation) Order, and the Victoria County History describes it rising one neighbourhood at a time: West Green mostly finished by 1951, Three Bridges begun in 1952, Langley Green complete in 1956. A district built over a few years tends to wear out in step, so the tiles, nails and underlay on one street often tire together. A leak on one house can be an early warning for its neighbours, and we ask what has already been done along the row before we climb.
At a glance
- The new town was designated in 1947
- West Green was mostly finished by 1951
- Ridges laid before 2014 may lack a mechanical fixing
1.1 Reading a 1950s tiled roof
The same history describes pale red brick walls under pitched tiled roofs for most of the decade's public housing. On a roof like that, at the edge of each slope, we raise a handful of tiles and check three things: whether the nails have corroded, how the battens (the narrow laths nailed across the rafters) are holding, and what, if anything, lies underneath as underlay. Extensions and garages added later meet the original tiling at flashings that get a check of their own. Ridge tiles are a particular weak point. Before BS 5534 was revised in 2014 a bed of mortar was accepted as sufficient, so ridges laid earlier may carry no clip or screw at all.
1.2 Patch, or strip and start again
Slipped tiles and a failed valley on one slope are patch jobs, and we recommend them as such. Nails rusted through on every slope, soft battens and a covering past its useful years point towards a re-roof. Building control then matters. The Planning Portal puts the limits for re-covering at less than 25 per cent of the building envelope and less than 50 per cent of the roof; past either limit, or with a covering 15 per cent heavier than the old, an application follows. Approved Document L takes the whole roof up to current insulation standards once over half its surface is renovated. Either the council's team or a registered building control approver can sign the work off, and we handle the paperwork when it is notifiable. Our written quote gives a single figure for the whole job. Our roof replacement page follows a re-roof from survey to completion.
Semi-detached roof costs across the UK
- Moderate roof repair£500 to £1,000
- Flat roof, semi£2,500 to £6,000
- Lean-to roof, semi£3,000 to £5,500
- Gable re-roof, semi£5,000 to £8,000
- Hipped re-roof, semi£8,000 to £12,000
Scaffold, access and your choice of covering decide where a roof lands in these ranges; the written quote after the survey fixes one total for yours. Source: MyBuilder roof repair and new roof price guides, updated 21/08/2026.