Chapter one
Where roofs meet flint and clunch walls
Washington's walls of flint, clunch, brick and sandstone leave plenty of junctions where lead, pointing and mortar decide whether a roof stays dry.
The Victoria County History describes Washington's buildings as brick, flint, clunch and sandstone, as befits a village on the border between the Downs and the Weald. A large brickworks worked the Gault clay north of the village between 1839 and 1899, so brick was close to hand. Clunch is a hard chalk quarried for building, and like flint it makes a thick, uneven wall full of joints. A roof has to meet that wall somewhere: at a gable end, beside a stack, or where a later extension steps up against an older cottage. A flashing is lead shaped over the join so that rain is carried across it and not behind it. Joins like these are a common starting point for a leak, and the stain indoors is rarely directly below.
At a glance
- Clunch is a hard chalk used as building stone
- Flint walls need tight lead and sound pointing
- Lead flashing can last over 80 years (MyJobQuote)

1.1 Lead set into an uneven face
A flint or clunch face gives no straight line to pin lead against. The mason cuts a groove, called a chase, along the mortar joints, the lead is tucked in and wedged, and the joint is pointed over it. If the pointing has dropped out, or the lead sits in a joint that has since crumbled, water gets behind it. On a pitched roof the lead climbs the wall as a stepped flashing, a staircase with one step per course, while soakers, small lead sheets slid beneath each tile, guide the water back out over the covering. We check every step for lead that has lifted, split or been smothered in sealant. A bead of sealant along a split flashing masks the fault until the next downpour, so we cut it out and dress fresh lead where the old has gone. Leadworx calls Code 4 the standard pick for everyday flashings, and lists Code 5 for pitched and vertical use.

1.2 Stacks and their flaunching
Of all the brickwork above a roofline, a chimney stack takes the worst of the weather. Frost and rain work on its pointing, the flaunching, the sloping collar of mortar round the pots, cracks and lets go, and the lead tray round the base tires. We inspect all three from the ladder or with a camera, and every fault goes into the photo set sent with your quote. Repointing a stack is a smaller job than rebuilding it, and we tell you which yours needs. Our chimney repairs page sets out both, and the lead roofing page covers the flashings.
Lead flashing in brief
- Code 4 lead
- 1.80 mm, the standard pick for general flashings (Leadworx)
- Code 5 lead
- 2.24 mm, listed for pitched and vertical use
- Code 3 lead
- 1.32 mm, recommended for soakers only
- Flashing lifespan
- Over 80 years, more for higher codes (MyJobQuote)
- Sheet standard
- Lead codes follow BS EN 12588
Source: Leadworx; Royston Lead; MyJobQuote, fetched October 2026




