Chapter one
Where the roof meets Lodsworth's sandstone
Lodsworth's oldest buildings have stone walls, and the junction of tiled roof with stone wall is our first place to look.
St Peter's church is built of local sandstone ashlar, which means squared and finely dressed blocks, and roofed with tile. It is listed Grade II*. The Manor House, south of the church, dates from two periods of the 13th century and is also Grade II*: sandstone under roughcast, with later brick and a modern tiled roof. Both show how much of an old village roof is decided by the wall it ends against. Where roughcast meets a roof, the render should stop short of the tiles so water can drain clear, since render carried down onto a covering holds damp against it. A tiled slope sits on timber, but its edges finish at masonry, and the junction with that masonry is where we expect many leaks to begin, not under the tiles themselves.
At a glance
- St Peter's is sandstone ashlar under tile
- The Manor House is Grade II*, partly roughcast
- Lead flashings seal a roof to a stone wall

1.1 Where roof meets stone
Where a slope butts a sandstone wall, the seal is a lead flashing let into a cut in the mortar joint and lapped over the tiles. On ashlar the joint runs straight and shallow, so the lead sits neatly. On roughcast it is harder to see where water travels, because the render can crack and let rain in behind it, and a stain inside the house may sit well away from the true entry point. We check the lead's fixing into the wall, the pointing above it and the gutter beneath, in that order. Lead is long-lived, with MyJobQuote putting flashings at over 80 years, but only while it is held tight and the wall behind it is sound.

1.2 Consent for the church and the manor
Roof work at St Peter's is decided inside the Anglican Church, through the Church's faculty jurisdiction, and not through the council's listed building process, because the church is still used for worship. That route covers listed building consent only: the government's guidance for places of worship says planning permission is still needed for development that affects the exterior. For the Manor House, consent comes from the planning authority. Park Authority guidance separates two things. Everyday maintenance and modest repairs made on the spot, copying what exists, can go ahead without listed building consent. Consent is needed once old fabric is changed or replaced and the building's special interest is affected. We quote a roof like that only once we have read what is on it and confirmed the route. Our lead roofing page covers flashings, valleys and gutters in lead.
What people sayEvery repair to a listed roof needs listed building consent first.
What is truePark Authority guidance exempts everyday maintenance and modest on-the-spot repairs; consent is needed once old fabric is replaced and special interest is affected.





