Roofers in Scaynes Hill

Scaynes Hill is a Weald village on the A272, in Lindfield Rural parish, with a Grade II red-brick church as its landmark. We survey the village's roofs and photograph each fault for you.

Three roof questions in a Weald village on the A272

  • A spire roof above a church tower

    A timber-clad spire in red brick country

    St Augustine of Canterbury Church is red brick, its nave built in 1858 to a Habershon design, and a later tower carries a timber belfry and a spire clad in wooden tiles.

    Read more about A timber-clad spire in red brick country

    A spire has hips meeting at a point, so its covering, fixings and timber are all exposed.

  • Flat roof beside a pitched one

    Extended houses and flat-roofed additions

    Wherever a house has been extended, the join between an older pitched slope and a newer one, or a flat-roofed addition, is where we look first for the way in.

    Read more about Extended houses and flat-roofed additions

    Flashings and falls decide whether the join stays dry.

  • Stone slabs on a pitched roof

    Sandstone under the Weald

    The village's Site of Special Scientific Interest is a disused quarry that exposes sandstone from the Wealden flood plain.

    Read more about Sandstone under the Weald

    Horsham slabs are sandstone too, so where a house does carry a stone slab roof, it needs stone-roofing methods, never a tile patch.

Street map of Scaynes Hill, north-east of central Worthing, with a pin on the town.

Checking against the planning map

Planning authority
Mid Sussex District Council
Councils
Mid Sussex District Council and West Sussex County Council
Conservation area
None; Scaynes Hill is not a conservation area
Listed example
St Augustine of Canterbury Church, Grade II, listed in 2006
Parish
Lindfield Rural civil parish, in the Weald on the A272
From central Worthing
24 road miles, north-east, about 36 minutes by car

Scaynes Hill roofs

A spire, a quarry and village roofs

Three things a Scaynes Hill roof owner should know, from the Grade II church to a re-roof on an ordinary village street.

Chapter one

The Grade II church and its timber-clad spire

A tower with a timber belfry and a spire is a different kind of roof job from a house, and the consent route differs too.

St Augustine of Canterbury Church is built of red brick, and its nave went up in 1858 to a design by the Habershon practice. The tower came later, with a timber belfry and a spire covered in thin tiles of split or sawn wood, and the building received Grade II listed status in 2006. A spire of this kind is a steep roof whose hips, the sloping ridges at each corner, climb to a single point. Everything on it is exposed to the weather: the boarding under the covering, the wooden tiles and their fixings at each hip, and the finial at the top. From the ground the faults hide, and a ladder only goes so far, so a proper look needs access that suits the height, planned before anyone climbs. A tower is no place for improvisation either: a temporary fix that traps water does more harm than none, so any make-safe we do up there is built to be undone.

At a glance

  • The nave dates from 1858, to a Habershon design
  • The tower, belfry and spire came later
  • Grade II listing dates from 2006

1.1 Where the tower meets the nave

Water finds its way into a church most readily where a tower rises out of a lower slope. The seal there is a lead flashing, a thin strip of lead bent over the join, and it has to stay tight to the brickwork with its upper edge locked into a chase, a groove cut into a mortar joint. Behind it, a gutter has to run clear, or the overflow soaks the wall. When the lead lifts, the water tracks inside the masonry and surfaces indoors a good way from the break, which is why we follow it back before quoting anything. Timber under a belfry and spire also needs checking from inside the tower, since a roof can look sound while the boarding beneath it is wet.

1.2 Who decides what may be done

A Church of England building still used for worship sits under the ecclesiastical exemption. Roof work there follows the Church's faculty process rather than the council's listed building consent. Once a church shuts for worship, the exemption stops and ordinary consent applies, and a scheduled monument always needs consent from the Secretary of State. A listed house in the village follows a different path again, with Mid Sussex District Council as the body to ask. We would never start on a listed roof without knowing which route applies. If you look after the church as a churchwarden or parish officer, we can photograph the roofs from the ground and from the tower and send you a plain written list of what we see. Our lead roofing page explains how flashings are dressed and what lead codes mean.

How a spire roof gets inspected

  1. Access first We plan safe access to the belfry and spire before anyone sets foot on them.
  2. Lead and hips Each hip, course of wooden tiles and flashing is checked for splits, lifted edges and corroded fixings.
  3. Timber below We look at the boarding and framing from inside the tower for damp and rot.
  4. Photograph Every defect is photographed so the parish sees exactly what we saw.

Chapter two

Re-roofing in a village with no conservation area

With no conservation area in the village, the rules that bite here are Building Regulations and, for listed buildings, listed building consent.

Stacks of new handmade clay plain tiles on scaffold boards
Stacks of new handmade clay plain tiles on scaffold boards

Scaynes Hill has no conservation area, so the extra care that a conservation area brings does not apply here. That does not mean anything goes. Putting back the same covering on a house is rarely a planning question, because a repair that leaves the outside appearance unchanged falls outside the definition of development. A listed house is the exception, because listed building consent applies, and a change of material or a new roof opening raises its own questions. Our roof planning permission guide covers those, and the planning team at Mid Sussex will answer any doubt.

At a glance

  • Scaynes Hill has no conservation area
  • Building control limits still apply to a re-roof
  • Scaffold on the road needs a county licence
Row of concrete sectional garages with weathered grey corrugated roofs
Row of concrete sectional garages with weathered grey corrugated roofs

2.1 Building control and the re-roof limits

The Planning Portal sets thresholds for repairs and re-covering. Stay within them and building control is usually left out of it. Exceed them and an application follows, checked by the council or by a registered building control approver. Two other triggers sit alongside: structural alterations, and a new covering that makes the roof 15 per cent or more heavier. Energy rules can follow too. Under Approved Document L, renovating more than 50 per cent of a roof's surface means upgrading the whole element, and replacing a flat roof's waterproof layer counts as renovating it. The table below lists the main triggers in one place. Where the work is notifiable, we take care of the notification ourselves. We remove the waste and leave the site clear when the job ends.

Row of concrete sectional garages with weathered grey corrugated roofs
Row of concrete sectional garages with weathered grey corrugated roofs

2.2 Scaffold on a village road

A re-roof on a house that fronts the road usually needs scaffolding, and scaffolding that obstructs a highway needs a licence under section 169 of the Highways Act 1980. In West Sussex the scaffold firm makes that application to the county council, which wants at least 10 working days' notice. Build that into your timetable, because an open roof waiting for a licence is the worst of both worlds. A quote you are weighing up should say whether it includes the scaffold and the VAT, and the standard VAT rate is 20 per cent on a re-roof. We raise scaffold access at the survey, so the licence question is settled before the poles arrive, not after.

When a re-roof needs a building control application

What the work involvesBuilding control position
Under 25 per cent of the building envelope and under 50 per cent of the roofNot normally needed
Either limit exceededApproval applies; a thermal upgrade may follow
Structural alterationsApproval needed
New covering 15 per cent or more heavierApproval needed
Covering performs differently in a fireApproval needed
Source: Planning Portal, Roof: Building Regulations, fetched October 2026

Chapter three

Chimneys, valleys and extensions on village houses

On ordinary roofs the faults to expect sit at the junctions, and a stain below is rarely directly under the break.

On an ordinary pitched roof, trouble gathers where the roof changes direction or meets something solid. A chimney stack takes weather on four faces. Its pointing wears, its flashings lift, and the soakers, the small folded lead sheets under the tiles beside the stack, can corrode. A valley is the trough where two slopes meet, and it takes the run-off from both slopes, so a split there shows quickly. A valley can be lined with lead or formed in tile, and we lift the tiles beside it to see the boarding underneath, because a valley that looks sound on top can be rotten below. An extension adds another junction, often a flat roof running up to an older wall. We look hard at every one of these, because a dab of sealant over any of them tends to fail by the next autumn.

At a glance

  • Chimney repointing guides span £500 to £2,000
  • A lead patch repair is guided at £150 to £250
  • Water rarely enters where the stain appears
Lead-lined valley where two clay-tiled roof slopes meet
Lead-lined valley where two clay-tiled roof slopes meet

3.1 What a chimney needs

MyBuilder gives chimney repointing as around £750, within a range of £500 to £2,000, and a stack rebuild at £2,000 to £10,000 or more. Removing a chimney breast is its own subject. The Planning Portal says Building Regulations approval always applies, and when the breast sits on a party wall, the GOV.UK guidance says the neighbour must be given notice from 2 months up to a year ahead of the start. Our chimney repairs page walks through the options, from repointing to rebuilding.

Lead-lined valley where two clay-tiled roof slopes meet
Lead-lined valley where two clay-tiled roof slopes meet

3.2 Extensions and flat roofs

A flat roof meeting a house wall needs a flashing that is lapped and sealed, and enough fall for water to leave the roof. IKO, citing BS 6229, says to design for 1 in 40 so that a finished fall of at least 1 in 80 is achieved. A flat roof that ponds water after rain has often lost that fall, and a membrane that is blistered or lifting at the edges will let water in at the wall first. We lift and test before recommending a patch or a recover, and you can read more on our flat roofing page.

When a repair properly solves a problem, we price only that repair. When a roof is past it, the photographs show you why, and we explain what a replacement involves before you decide.

Typical UK costs for common village-roof jobs

  • Lead patch repair£150 to £250
  • Ridge re-bedding£300 to £600
  • Chimney repointing£500 to £2,000
  • Flat roof, semi£2,500 to £6,000

None of these is a Watertight price. After the survey you receive a written quote with one total for your own roof. Source: MyJobQuote lead work (22/09/26); MyBuilder chimney, slate and new roof price guides, updated 21/08/2026.

Scaynes Hill roof questions, from the church spire to the A272

Who looks after the roof of St Augustine's church at Scaynes Hill?

That sits with the parish and the Church of England, whose own faculty process governs works to a listed church while it is used for worship. We can survey the wooden tiles, hips and timber at the spire and tower, and photograph the faults, but approval for the work itself comes from the Church. Our part is a clear, photographed account of what the roof needs.

Do Scaynes Hill houses need planning permission to re-roof?

Putting the same covering back is not usually a planning matter, and the village is not on Mid Sussex District Council's conservation areas list. A listed building is the exception, since listed building consent covers work that affects its character. A new roof window or dormer is a separate question, answered in our planning guide. If you are unsure, the council's planning team will tell you, and we can send photographs to help.

My Scaynes Hill extension roof leaks at the wall. Is it the felt or the flashing?

It is often the flashing, the strip that seals the roof to the wall, though a worn membrane or poor falls can leave the same stain. We check the junction first, then the surface, and test for ponding. If the cause is a lifted edge or a failed flashing, the repair is small. If the membrane is exhausted, the survey photographs show why and what a recover involves.

What does a written quote for a village re-roof actually include?

It sets out a single total for the work we surveyed, with photographs of your roof attached. Check whether it covers scaffolding and VAT, because a scaffold licence may be needed on a road frontage and the standard VAT rate is 20 per cent. It also names the survey date, so you know which roof it describes. If your roof needs only a repair, the quote describes the repair rather than a larger job.

Tell us about your roof

Describe what is happening and we will call you back to arrange a visit.

  • Photographs of what we find
  • A written quote with one total price
  • Or call 01903 299063

10-year workmanship guarantee, in writing.

Call Get a quote